Steel beams that will make up new Bucks arena delivered by boat at Port of Milwaukee



MILWAUKEE -- Steel beams that will eventually make up part of the new Milwaukee Bucks arena arrived by boat at the Port of Milwaukee Monday, November 14th.

The beams, many of which are over 50-feet long, were then on the way to Merrill Iron and Steel in Schofield.

There, they will be cut and detailed to meet the specific design specs for the new arena.

The arena is scheduled to be completed in 2018.

PHOTO GALLERY