Extreme cold has slowed work on Zoo Interchange project; full closure rescheduled

This is an archived article and the information in the article may be outdated. Please look at the time stamp on the story to see when it was last updated.

(WITI) -- The extreme cold has slowed work on the Zoo Interchange project -- and a full closure of I-94 has been rescheduled. Ryan Luck with the Wisconsin Department of Transportation joins FOX6 WakeUp with the details.